Energy-system metrics¶
Suitability: ❌ Out of scope for meteosynth itself. Each of these needs an energy model (a power-system dispatch model, a load profile, a building simulator) that the package doesn’t include.
These metrics answer the question the synthetic weather is ultimately for: does it lead to the same engineering decisions as real weather? They are listed here because the literature expects them, and so you can see where they would plug in.
Loss of Load Expectation (LOLE)¶
In plain words: the expected number of hours per year when the available power is not enough to meet demand.
\(C_t\) is the available capacity and \(L_t\) the load at hour \(t\). Loss of Load Hours (LOLH) is the same idea counted in hours.
Comment: synthetic weather that smooths out variability or misses multi-day calms gives LOLE values that are too optimistic. The Spell lengths (run lengths) and Autocorrelation (ACF) tests are the upstream checks that predict this.
Expected Energy Not Served (EENS)¶
In plain words: not how often the power falls short, but how much energy is missing in total.
Comment: same sensitivity as LOLE, and more affected by the depth of shortfalls.
Storage sizing and net-load deficit¶
In plain words: how big a battery or hydrogen store must be to get through the worst stretch of low wind and sun.
Comment: very sensitive to long spells, and also to joint wind–sun lulls, which meteosynth doesn’t currently model (see Tail dependence (λ_L, λ_U)). Breaks at the joins between synthetic days would also cause false charge/discharge cycles (see Midnight seam). Expect synthetic storage requirements to be underestimated until those gaps are closed.
Building thermal loads¶
In plain words: feed synthetic temperature and sunshine into a building simulator (for example EnergyPlus) and compare peak heating/cooling loads and annual energy use with the results from real weather.
Comment: peak cooling depends on hot and sunny hours happening together, which meteosynth doesn’t reproduce, because the variables are generated independently. Annual totals are a fairer test than peaks for now.
Bottom line: run these in a downstream study, once the fidelity metrics in this section have passed. Read any result alongside the known limitations: no cross-variable coupling and no year-to-year memory.