Concepts and terminology

The rest of the documentation assumes a handful of words. This page defines them in plain language, starting with the one everything else hangs off: ensemble.

If you want the mathematics instead, go to Theory. If you want to run something, go to Quickstart.


Start here: what an ensemble is

Suppose you want to know how much sun a solar panel gets on 21 May at your site.

  • You could look at last 21 May. That gives you one number — but it might have been a freakishly cloudy day, and you would never know.

  • You could look at every 21 May you have records for. Eleven years gives eleven numbers. Better. But eleven is not many, and none of them is next year’s 21 May.

  • Or you can build a machine that has learned what 21 May is like at your site, and ask it for two hundred fresh 21 Mays. All different. None of them a copy of a real day. All of them days the local weather knows how to make.

That pile of two hundred days is an ensemble. Each single day in it is a realisation (or a draw).

It is a bit like weather dice — except the dice are shaped by history, so they can only roll days your site could actually have. Roll once and you get a day. Roll two hundred times and you get something one day could never give you: how often each kind of day happens, including the rare bad ones.

        flowchart LR
    R["11 years of<br/>real 21 Mays"] --> M["one fitted model<br/>of '21 May here'"]
    M --> D1["synthetic day 1"]
    M --> D2["synthetic day 2"]
    M --> D3["synthetic day 3"]
    M --> Dn["… day 200"]
    D1 --> E["the ensemble"]
    D2 --> E
    D3 --> E
    Dn --> E
    

Why bother? Because the questions worth asking are about the rare days, not the average one. How big must the battery be for the worst week? How low can production go in a bad year? What do I promise a lender? One day answers “what happened”. An ensemble answers “what can happen, and how often” — and that is a distribution, not a number.

Note

An ensemble cannot invent information the record does not contain. It re-samples the statistics it was shown, so a site with eleven mild years produces a synthetic ensemble of mild years. It fills in the gaps between observed weather; it does not predict weather the site has never had, and it knows nothing about a changing climate.

Ensemble versus the alternatives

Option

What it is

What it tells you

What it hides

One historical year

Real measurements from one specific past year

Exactly what happened, once

Everything else that could have happened

The whole record

All the measurements you have (here: 11 years)

The range that did occur — 11 answers

The tail. Eleven years cannot show you a 1-in-50 event, and you cannot ask for a twelfth answer

TMY (Typical Meteorological Year)

Twelve real months, each picked from a different year, stitched into one “representative” year

A sensible average year, in one file

Variability by construction — it is built to be typical, so it has no bad years in it. One profile, one answer

One synthetic realisation

One fresh series drawn from the fitted model

One plausible alternative history

Same blind spot as one real year: no spread

An ensemble

Many independent realisations of the same thing

A distribution: P50, P90, worst case, spread

Nothing about spread — but it is only ever as good as the model and the record behind it

The one-line version: the historical record is a sample of fixed size; an ensemble lets you draw as many samples as you like from the same statistics.

Two ways to build one here

Inside meteosynth the word “ensemble” covers two different things, and picking the wrong one is the most common way to get a plausible-looking but meaningless answer.

Independent days

Chained series

Call

gen_day() in a loop

generate_series(start, n_days)

Each day starts from

that date’s fitted initial distribution π(x₀)

the previous day’s 23:00 value, via the cross-midnight model

Days are

independent of each other

linked in order

Answers

“What can a 21 May look like?”

“What does a whole May / year look like, in sequence?”

Use it for

single-day questions, distributions of a daily quantity

anything where order matters: battery state, streaks of cloudy days, monthly and annual totals

Example script

use_cases/day/day_envelope_*.py

use_cases/year/synthetic_year.py

You can also have an ensemble of chained series — call generate_series twelve times and you have twelve synthetic Mays (use_cases/month/monthly_statistics.py), or a hundred times for a hundred synthetic years. That is the shape a real Monte-Carlo study takes.

Both calls live on DayWindowGenerator, so one fitted object covers every scale — Quickstart shows a day, a month and a year from the same three lines of setup.

Note

The boundary of a call is the reset. Within one generate_series call the days are chained across midnight; between two calls nothing is carried over. So “500 independent days” is generate_series(..., n_days=1) called 500 times, not one call with n_days=500.


The vocabulary

What you start with

Term

What it means

Record / observed data

The historical measurements you train on — here, hourly PVGIS data. Also called the training data.

Attribute

One measured quantity, named by its column: poa_global, temp_air, wind_speed. Each is modelled separately.

Index columns

year, month, day, hour — the calendar every record must carry.

Wide format

The record reshaped to one row per day and one column per hour (24 columns). Pairing values within a day is safe in this shape, which is why the package pivots into it.

Training subset

The slice of the record one model is fitted to. Two ways to cut it: a month subset (all of May) or a rolling day window.

Rolling day window

Every day within ±n days of a target date, pooled across all years. A 21 May window with n_days=15 pools 6 May – 5 June from all eleven years: 341 days. Centred on the target and slides smoothly from one day to the next, which a month subset does not.

Pooled / climatological

Taken from all years at once, treated as samples of “what this time of year is like” rather than of any specific year.

What the model is

Term

What it means

Distribution

The full picture of what values are possible and how likely each is — not just an average.

Conditional distribution

A distribution given something else. “How windy at 14:00, given it was 3 m/s at 13:00.” Written \(p(x_t \mid x_{t-1})\).

Transition

One step from one hour to the next. The model holds 23 of them per day (01:00 → 23:00), each fitted separately.

Transition pair

One (previous, current) observation — the raw material a transition is fitted from.

Markov chain, first-order

The assumption that the next value depends only on the current one, not on the whole history. It is what makes an hour-by-hour walk possible.

KDE (kernel density estimation)

A way of turning scattered points into a smooth distribution — a histogram with soft edges rather than bars.

Bandwidth

How much smoothing the KDE applies. Small = follows the data closely and can look lumpy; large = smooth but washes out detail.

π(x₀) (initial distribution)

The distribution of the first value of a chain — the observed midnight values for that date. Nothing precedes hour 0, so it cannot be a transition. For irradiance every observed midnight is 0, so π(x₀) is a spike at zero and every synthetic day starts there — from the data, not from a hard-coded rule.

Cross-midnight model

The transition 23:00 (yesterday) → 00:00 (today), fitted from genuinely consecutive calendar dates. It is what carries a chained series across midnight.

Degenerate

A transition with nothing to model, because the data does not vary — night-time irradiance is exactly 0 every hour of every year. The package detects this and returns the constant instead of fitting a density to it.

Support

The physical bounds of a quantity: irradiance ≥ 0, wind speed ≥ 0, temperature ≥ −273.15 °C. Sampling is truncated to the support, so an impossible value is unsamplable, not merely unlikely.

Spec / registry

The declaration of what a column physically is (support, units, name). A column can be modelled if and only if it has one, which is how the package stays open to new quantities.

What comes out

Term

What it means

Synthetic

Generated, not measured. Every value is drawn from a fitted distribution; nothing is copied from the record.

Realisation / draw

One generated series — one day, one month, one year.

Ensemble

Many realisations of the same thing, treated as a sample of what is possible.

Chained

Days joined in order across midnight, so the series is continuous.

Seed / RNG

The number that fixes the randomness. Same seed, same output — which is what makes a stochastic script reproducible.

How you judge it

Term

What it means

Envelope / band

A shaded region showing where most observed days fall, usually between the 10th and 90th percentile at each hour.

Cloud

The individual observed days drawn as separate thin lines, rather than summarised into a band.

Percentile

The value below which a given share of cases falls. The 90th percentile is exceeded by only 10% of days.

P50 / P90

The energy-industry convention, and it runs the other way: the value exceeded in 50% / 90% of cases. So P90 is the pessimistic figure — the one a lender asks about — and it sits at the 10th percentile.

Coverage

The share of synthetic values landing inside the observed p10–p90 band. About 80% means the ensemble is as wide as the weather. Much higher means it is too narrow; much lower means too wide.

Bias

A systematic offset: the synthetic mean sitting consistently above or below the observed one.

Spread ratio

Synthetic standard deviation ÷ observed standard deviation. Near 1 is right; below 1 understates risk, above 1 overstates it.

Calibrated

Getting the magnitudes right, not just the shape. A generator can trace a perfect diurnal curve and still deliver 14% too much energy.

Monte-Carlo

Answering a question by running it over many random realisations and looking at the distribution of answers, instead of one “best guess” run.


Reading an envelope figure

The use_cases/day/day_envelope_*.py scripts all produce the same picture, so it is worth learning once:

What you see

What it is

Pale blue band

Observed p10–p90 — where the middle 80% of nearby real days fall, hour by hour

Thin blue lines

The actual observed days for that exact date, one per year — the cloud

Dashed blue line

Median of the observed days

Thin orange lines

A handful of individual synthetic days, to show their texture

Dotted orange lines

The synthetic ensemble’s own p10–p90

Solid orange line

Median of the synthetic ensemble

Right-hand panel

One number per day (daily total or mean) — the quantity an energy model actually consumes

A good result is: the orange median tracks the dashed blue one (shape), the orange band is about as wide as the blue one (spread), and the orange mass in the right-hand panel sits on top of the blue (quantity). Those three can fail independently, which is why all three are reported.


Where to go next